Skip to content

Ranova · solar plants

Request feasibility

From your land to the grid, in one hand.

We run every step from site survey to grid connection. You make the decision; we start the production.

See the process

In numbers

  • 46MWpInstalled capacity
  • 11projects8 built, 3 in progress
  • 73,600MWh / yearAnnual production
  • 30,000householdsAnnual consumption equivalent

Illustrative values: in this showcase the numbers are not a real company's data but examples calculated with the stated assumption. Calculation assumption: about 1,600 MWh of annual production per 1 MWp installed and 2,400 kWh of annual consumption per household.

What we take on in a project

Site survey and feasibility

Irradiance, shading and ground data are measured on site. The report is delivered together with its assumptions.

Design and permits

Single-line diagram, structural calculation and the grid connection application run in one file.

Installation and commissioning

Mounting structure, modules, inverters and cabling are installed by our own crews. Commissioning tests are documented.

Monitoring and maintenance

Production is monitored at plant, inverter and string level. When a deviation appears, a site visit is scheduled.

Ranova a view from the production monitoring screen

Who it is for

Factory and warehouse roofs

Factory and warehouse roofs

Rooftop plant for self-consumption. Production overlaps daytime use; the surplus goes to the grid.

Land investment

Land investment

Plant construction on open land. Survey, permits and grid connection run in one file.

Farms and greenhouses

Farms and greenhouses

Power sized to the site for irrigation pumps and greenhouse climate control. The plan follows the season.

What it means on site

One point of contact

One point of contact

Same team, same project file from survey to maintenance.

Documented commissioning

Documented commissioning

Every string is tested; results go into the handover file.

Our own mounting structure

Our own mounting structure

Calculated for ground and wind load, assembled on site.

Open monitoring

Open monitoring

Production data stays in your account and can be exported whenever you like.

Grid connection

Grid connection

Transformer, switchgear and metering point are built in the same project; we handle the connection application.

Maintenance and cleaning

Maintenance and cleaning

Cleaning and inspection visits are planned from production data; the outcome is written to the file.

Why us

A plant earns its value not with the signed contract but with every kilowatt-hour it produces over the years. That is why we do not hand over and walk away: from survey to maintenance the same team, the same file, the same responsibility.

  • One point of contact

    The team that writes the feasibility study also builds and monitors the plant. Every handover in between is a source of error; we remove the handover.

  • Numbers stated with their assumption

    Production estimate, payback period and yield are delivered together with the assumption they were calculated on.

  • Designed for the last year

    Structure, cabling and the maintenance plan are built for the plant's final year, not its first.

Calculate for your own site

Enter your roof or land area; installed capacity, annual production and the household equivalent are calculated with the assumption on this page.

5,000m²

  • 769kWpInstalled capacity
  • 1,231MWh / yearAnnual production
  • 513householdsAnnual consumption equivalent

Calculation assumption: about 6.5 m² of area per 1 kWp, about 1,600 MWh of annual production per 1 MWp installed and 2,400 kWh of annual consumption per household. Results are illustrative; final values are set by the site survey and the equipment selected.

How a project moves

Survey

Survey

The land and the grid connection point are inspected on site.

Feasibility

Feasibility

Production estimate, cost and assumptions are gathered in one report.

Installation

Installation

Structure, module and inverter assembly is done by our own crew.

Commissioning

Commissioning

Tests are completed and production goes into monitoring.

Our projects

Illustrative distribution: in this showcase the marked provinces are not real projects; they show how the map works.

Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants Ranova · solar plants
Hover a province or pick from the list.

Two ways to start

Request feasibility

We run every step from site survey to grid connection. You make the decision; we start the production.

  • Site survey report and shading analysis
  • Production estimate together with the assumptions it was calculated on
  • Roadmap for grid connection and permits
Request feasibility

Assumptions and conditions

  1. This page is a showcase example produced with Ranova Creative OS. The plant service described is illustrative.
  2. Production estimates depend on the site survey and the equipment selected. Every feasibility study is delivered with its own assumptions.
  3. Images are AI generated and do not show a real facility.
  4. Provinces on the project map are illustrative; for a real client this section is filled from the company's sourced project list.
  5. Values in the numbers section are illustrative and calculated with the assumption stated on the page; for a real client they come from the company's sourced production data.

Create a free website with Framer, the website builder loved by startups, designers and agencies.